Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

highplainsdem

(63,930 posts)
Thu Jul 9, 2026, 09:41 AM 21 hrs ago

The 'time-consuming' permits dozens of data centers are skipping

https://www.politico.com/news/2026/07/08/trump-data-centers-water-supreme-court-00958383

-snip-

As a tidal wave of sprawling energy- and water-guzzling data centers are proposed across the country, opponents are finding that one of their strongest levers for challenging projects has all but disappeared.

That’s thanks to a 2023 ruling from the Supreme Court that dramatically shrank the number of streams and wetlands protected by the Clean Water Act. Once one of the most important permits that virtually all construction projects needed, now everything from subdivisions to oil pipelines to data centers can be built without federal water pollution permits if the streams and wetlands they are filling in or contaminating fall outside the law’s scope.

-snip-

Located where Canton’s suburban outskirts transition to open space and small farms, the Amazon-backed project is one of at least 26 data centers being built nationwide in sensitive streams and wetlands with streamlined water pollution permits, according to a POLITICO analysis of 95 Army Corps of Engineers documents and permit records from January 2024 to this past June.

-snip-

Now, the booming data center industry is reaping the benefits of the Supreme Court’s shrunken approach to which waters get federal protection as well as the Trump administration’s efforts to further restrict it, according to POLITICO’s analysis. The administration is proposing to only regulate wetlands and streams that physically touch a larger waterbody — like a major lake or river — and are brimming with water for at least part of the year.

-snip-


Much more at the link. All of it upsetting.
2 replies = new reply since forum marked as read
Highlight: NoneDon't highlight anything 5 newestHighlight 5 most recent replies
The 'time-consuming' permits dozens of data centers are skipping (Original Post) highplainsdem 21 hrs ago OP
If AI is so great, why can't AI fill out its own permits? biophile 20 hrs ago #1
This is the "Abundance Agenda" in action Fiendish Thingy 20 hrs ago #2

Fiendish Thingy

(24,693 posts)
2. This is the "Abundance Agenda" in action
Thu Jul 9, 2026, 10:05 AM
20 hrs ago

The Abundance Agenda, supported by Third Way Centrist Democrats, is a Trojan Horse claiming to cut red tape and create jobs, when in reality it guts environmental regulations, labor laws and building codes to accelerate projects without community input and maximize profits.

https://kayuma.substack.com/p/the-abundance-delusion-how-silicon

The impact of data centers on communities and community resources is an issue that cuts across partisan divides. AOC went to a rural Texas community affected by a massive data Center to hear from the very conservative residents about how it had affected their lives, and received a polite, even warm welcome, as she was the only politician who had cared enough to listen to them.

Latest Discussions»Issue Forums»Environment & Energy»The 'time-consuming' perm...